TRAINNING OF RCC (Rebar) DETAILING AND BAR BENDING SCHEDULES (BBS)
SYLLABUS (ON AUTO CAD AND BBS SOFTWARES)
1) Foundations, like raft foundation, pile caps, Isolated and Open footings, continuous footings.
2) Columns, from footing starter bars to the roof level with Elevation and Sections
3) Beams, like Tie beams, Drop beams (simply supported and continuous) cantilever beams, hidden beams etc. with cross sections of beams and sections.
4) Slabs, like Solid slabs (one-way and two ways) continuous slab, Rib slab etc.
5) Walls, like Retaining wall, Shear wall, Core wall (Staircase and Lift)
6) Tanks&Rcc Pardies, like Underground water tanks, Overhead water tanks, Balconey pardies etc.
7) Staircase, flight from plinth to midlanding and midlanding to floor level.
ELIGIBILITY
Degree/Diploma civil engineers experience at site, Draftsman and Fresher also.
SELF PROFILE
Name : - ABDUL SAMAD ABDULLAHA INAMDAR
Contact no. : - 9930510670, 9930610729
Email : - asainamdar@gmail.com
Experience
Having 27 years of working experience in Rebar detailing and bar bending schedules in Mumbai and Abroad with MNC multinational companies and well reputed national companies in Rebar detailing and bar bending schedules as per BS code 4466 and 8666 and ASTM and as well IS codes. Worked for rebar detailing manually and on computer, detailing on Auto Cad from R-9 till R-2008,Micro station version -5 and Rebar cad software and there are others software specially for only BBS like ARMOUR ,LT etc. One of the prestigious project completed in Mumbai Kohinoor Square Project dadar when was in L&T as BBS Head of department.
TRAINING EXPERIENCE
Have been training students in Saar Engineering Ltd in the year of 2006 to 2010 as well in INAMDARS ACADEMY (who are specialist in REBAR BBS DETAILING COURSES with Registered Certification from ministry)in Navi Mumbai since 2012 till contineou in Rebar detailing and BBS manually and on Auto Cad and Excel as per BS and IS codes.
CRASH COURSE DURATION : For Experience Engineers & draftsman 1 MONTH
For freshers Engineers and draftsman 2 MONTH
For Site Experience Managers 15 days
SCOPE OF JOBS IN COMPANIES:-
CRASH COURSE DURATION : For Experience Engineers & draftsman 1 MONTH
For freshers Engineers and draftsman 2 MONTH
For Site Experience Managers 15 days
SCOPE OF JOBS IN COMPANIES:-
This kind of jobs has very good scope and high salary range in U.K. , U.S.A, and most of the Gulf countries. Nowadays in India also, especially in metropolitan city like Mumbai for High rise Tower Projects people having experience in Rebar detailing and BBS are most preferred. There are lot of multinational companies, design and detailing offices in Mumbai which provides such jobs. Following are the branches which provide such Jobs.
- DESIGN AND ENGINEERING CONSULTANCY.
- REPUTED CONSTRUCTION COMPANIES.
- REPUTED BUILDERS AND DEVELOPERS.
- REBAR CUT AND BEND OFFICES&FACTORIES.
- REBAR DETAILING CONSULTANCIES.
1. When Bar bending schedule is available, cutting and bending of reinforcement can be done at factory and transported to site. This increases faster execution at site and reduces construction time and cost due to less requirement of workers for bar bending. Bar bending also avoids the wastage of steel reinforcement (5 to 10%) and thus saves project cost.
2. Using bar bending schedule for when used for Fe500, it saves 10% more steel reinforcement compared to fe415.
3. It improves the quality control at site as reinforcement is provided as per bar bending schedule which is prepared using the provisions of respective detailing standard codes.
4. It provides the better estimation of reinforcement steel requirement for each and every structural member which can be used to compute overall reinforcement requirement for entire project.
5. It provides better stock management for reinforcement. Steel requirement for next phase of construction can be estimated with accuracy and procurement can be done. This prevents stocking of extra steel reinforcement at site for longer time, preventing corrosion of reinforcement in case of coastal areas. It also prevents shortage of reinforcement for ongoing work by accurate estimation and thus concrete construction works can proceed smoothly.
6. Bar bending schedule is very much useful during auditing of reinforcement and provides checks on theft and pilferage.
7. Bar bending schedule can be used for reinforcement cutting, bending and making skeleton of structural member before it can be placed at the required position. Other activities such as excavation, PCC etc can proceed parallel with this activity. So, overall project activity management becomes easy and reduces time of construction. It becomes helpful in preventing any damages due to construction time overrun.
8. It provides benchmarks for quantity and quality requirements for reinforcement and concrete works.
9. Bar bending schedule provides the steel quantity requirement much accurately and thus provides an option to optimize the design in case of cost overrun.
10. It becomes easy for site engineers to verify and approve the bar bending and cutting length during inspection before placement of concrete with the use of bar bending schedule and helps in better quality control.
11. It enables easy and fast preparation of bills of construction works for clients and contractors.
12. The quantity of reinforcement to be used is calculated using engineering formulas and standard codes, so there is no option for approximate estimation of steel reinforcement.
13. With the use of bar bending schedule, mechanization of cutting and bending of reinforcement can be done, again reducing the cost and time of project and dependency on skilled labor requirement. It also improves the reliability on accuracy of bar cutting and bending.
14. When mechanized bar cutting and bending is used, the cost of reinforced concrete work per unit reduces and helps in cost optimization of construction project.